Medicine Hat Hospital
Hospital, Projects
Highlights:
- Enthalpy energy recovery wheels with pressure reducing bypass dampers when energy recovery not needed
- Component layout customized to maximize energy savings for a dry climate
- Multiple stages of filtration: 30%, 95%, 99.99% HEPA
- Integral unit mounted silencers constructed of aluminum with liner between fill and perf
- Snow melt coil upstream of heat wheel and separate location for filters in winter time.
- 50000 CFM
- Acoustiflo fans with internal spring isolation and carefully engineered airflow path allowing for very efficient fans and low sound levels
- Built-in motor removal rail rigging system
- Integral catwalk and access ladder for upper deck
- 4 inch sound absorptive casing with aluminum wash down liner
- 3/16” thick continuously welded aluminum checker plate floor
Project Gallery